首页> 外文期刊>OR Spectrum >A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem
【24h】

A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem

机译:解决电影排程问题的模型,启发式程序和决策支持系统

获取原文
获取原文并翻译 | 示例
       

摘要

Creating a movie shoot schedule is an important part of the movie production process. Even for a small movie project already 50 activities requiring 130 resources such as different actors, director, team, special effects and locations etc. have to be scheduled respecting complex constraints which may be imposed on single resources as well as on every activity. In this paper, we present the movie shoot scheduling problem and formulate a conceptual model. We present a metaheuristic approach for generating operational schedules, outline the modules of the decision support system Schedule This which we have developed and finally we shortly report practical experiences. Our experience from using the DSS in real movie shooting projects shows significant improvements with respect to faster and better scheduling as well as ad hoc re-scheduling.
机译:创建电影拍摄时间表是电影制作过程的重要组成部分。即使对于一个小型电影项目来说,也已经安排了50个需要130种资源的活动,例如不同的演员,导演,团队,特技效果和位置等,同时考虑到可能对单个资源以及每个活动施加的复杂约束。在本文中,我们提出了电影拍摄调度问题并建立了概念模型。我们提出了一种用于生成操作时间表的元启发式方法,概述了我们开发的决策支持系统“时间表”的模块,最后我们很快报告了实际经验。我们在实际电影拍摄项目中使用DSS的经验表明,在更快,更好的排程以及临时重新排程方面有了显着的改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号