首页> 外文期刊>SPE Drilling & Completion >Analysis of Post-Audits for gulf of Mexico Gravel-Packed Oilwell completions Leads to Continuous Improvement In Completion Practices
【24h】

Analysis of Post-Audits for gulf of Mexico Gravel-Packed Oilwell completions Leads to Continuous Improvement In Completion Practices

机译:墨西哥砾石填充的油井完井区域的审计结果的分析导致完井实践的不断改进

获取原文
获取原文并翻译 | 示例
       

摘要

Final production rate alone is not an adequate measure of the success of a well completion. Rather, we must estimate the "po- tential" of a reservoir and judge the ultimate success of a comple- tion on how close we come to achieving this potential. Specific productivity indexes (SPI's) [BFPD/fit]/psi], specific injectivity indexes (SII's) [(BFPD/ft/psi), and completion efficiencies (CE's) (percent of Darcy radial flow) can be calculated at various times throughout a well completion.
机译:单凭最终生产率不足以衡量完井成功与否。相反,我们必须估算储层的“潜力”,并就我们如何接近实现这一潜力做出判断,以最终完成一项成功。可以在整个不同时间计算比生产率指数(SPI)[BFPD / fit] / psi],比注入指数(SII)[(BFPD / ft / psi)和完井效率(CE)(达西径向流量的百分比)完井。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号