首页> 外文期刊>SPE Drilling & Completion >Optimization of Mud Cleanup for Openhole Horizontal Wells
【24h】

Optimization of Mud Cleanup for Openhole Horizontal Wells

机译:裸眼水平井泥浆清理的优化

获取原文
获取原文并翻译 | 示例
       

摘要

Successful completion of openhole horizontal wells requires re- moval of potential impairment form the near wellbore and forma- tion face. Impairment can reduce well productivity and lead to failure of sand control screens due to plugging and erosion. Shell has adopted the practice in the Gulf of Mexico of employing drill-in fluids with acid-soluble bridging and weighting agents for all openhole drilling and extensive displacement and acid cleanup procedures during horizontal well completions.
机译:裸眼水平井的成功完成需要从井眼和地层附近去除潜在的损害。减损会降低油井的生产率,并由于堵塞和侵蚀而导致防砂筛的失效。壳牌在墨西哥湾采用的做法是,在水平井完井过程中,将钻井液与酸溶性桥接剂和增重剂一起用于所有裸眼钻井以及广泛的驱替和酸洗程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号