首页> 外文期刊>SPE Drilling & Completion >Utilization of Mud Weights in Excess of the Least Principal Stress to Stabilize Wellbores: Theory and Practical Examples
【24h】

Utilization of Mud Weights in Excess of the Least Principal Stress to Stabilize Wellbores: Theory and Practical Examples

机译:利用最小主应力过大的泥浆重量来稳定井眼:理论与实践实例

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, we address the theoretical possibility of drilling with mud weights in excess of the least principal stress for cases of par- ticularly high pore pressure or severe wellbore instability. Because lost circulation caused by hydraulic fracturing is to be avoided, we consider three critical wellbore pressures, p_(frac), p_(link), and p_(grow). Tensile fractures initiate at the wellbore wall at p_(frac), link up to form large axial fractures that are subparallel to the wellbore axis at p_(link), and propagate away from the wellbore at p_(grow). It is obvious that lost circulation cannot occur if the wellbore pressure during drilling is below p_(frac).
机译:在本文中,我们讨论了在特别高的孔隙压力或严重的井筒失稳情况下,用泥浆重量超过最小主应力进行钻探的理论可能性。因为要避免因水力压裂而造成的井漏,所以我们考虑了三个临界井眼压力:p_(压裂),p_(连接)和p_(增长)。拉伸裂缝始于p_(frac)处的井眼壁,连接形成大轴向裂缝,这些裂缝与p_(link)处的井眼轴平行,并在p_(增长)处远离井眼传播。显然,如果钻井过程中的井眼压力低于p_(frac),则不会发生漏失循环。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号