...
首页> 外文期刊>SPE Drilling & Completion >Multiple Proppant Fracturing of Horizontal Wellbores in a Chalk Formation: Evolving the Process in the Valhall Field
【24h】

Multiple Proppant Fracturing of Horizontal Wellbores in a Chalk Formation: Evolving the Process in the Valhall Field

机译:粉笔地层中水平井筒的多支撑压裂:Valhall油田的演化过程

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Oil production from this chalk field has been improved signifi- cantly over the last 3 years using multiple proppant fractures placed from horizontal completions. Following early successes, the engineering effort focused on increasing value through engi- neering innovation and increased productivity. This paper describes, through case histories and field data, advances made in the design and execution of these completions over 13 wells in the Valhall field.
机译:在过去的三年中,利用水平完井中的多处支撑剂压裂,该粉笔田的石油产量得到了显着改善。在早期取得成功之后,工程工作着重于通过进行创新和提高生产率来增加价值。本文通过案例历史和现场数据,描述了Valhall油田13口井的完井设计和执行进展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号