首页> 外文期刊>Spaceflight >KHRUNICHEV SPACE CENTER
【24h】

KHRUNICHEV SPACE CENTER

机译:赫鲁尼切夫航天中心

获取原文
获取原文并翻译 | 示例
       

摘要

Khrunichev initiated construction of the International Space Station by developing, manufacturing and launching the Zarya functional cargo module or FGB-1 on 20 November 1998. It is also involved with the preparation and planned Proton launch on 12 November of the Zvezda service module in cooperation with RKK Energia, the prime contractor. It is to provide the ISS with a multipurpose module and a universal docking module as part of Russian participation in the ISS. Dr Sergei K. Shaevich, ISS/FGB Programme Director, stated that the back-up of Zarya could be converted into a multipurpose module and that the universal docking module is still on the drawing board.
机译:赫鲁尼切夫于1998年11月20日通过开发,制造和发射Zarya功能性货运模块或FGB-1来启动国际空间站的建设。它还参与了Zvezda服务模块的准备工作和计划​​于11月12日发射的质子。 RKK Energia,总承包商。作为俄罗斯参与国际空间站的一部分,它将为国际空间站提供一个多功能模块和一个通用对接模块。 ISS / FGB项目总监Sergei K. Shaevich博士说,Zarya的备份可以转换为多功能模块,而通用对接模块仍在设计板上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号