1.In FY12, the U.S. DoD plans to complete fabrication of the two EPS payloads and begin integration onto the host satellites 2.EPS payloads will be integrated into unidentified host spacecraft 3.EPS development is progressing; launches are classified, but FI expects them to occur in FY15 and FY17.
展开▼