首页> 外文期刊>Software Quality Journal >Reconciliation of scrum and the project management process of the ISO/IEC 29110 standard-Entry profile-an experimental evaluation through usability measures
【24h】

Reconciliation of scrum and the project management process of the ISO/IEC 29110 standard-Entry profile-an experimental evaluation through usability measures

机译:Scrum和ISO / IEC 29110标准进入概况的协调和项目管理过程 - 通过可用性措施进行实验评估

获取原文
获取原文并翻译 | 示例
           

摘要

Software process standards and models are used in large- and medium-sized organizations to reach the Iron Triangle. In contrast, small and very small entities either ignore them or cannot apply them because these standards and models are technically and economically not affordable. Consequently, agile software development practices are usually used by small and very small organizations. The ISO/IEC 29110 series of standards and guides are now available for very small organizations, but their utilization with agile practices represents an agility-rigor reconciliation problem. In this research, we report the experimental evaluation of Scrum + EPG (a reconciled agile-rigorous software Project Management process from Scrum, and the Project Management process of the ISO/IEC 29110 series-Entry profile, documented in an Electronic Process Guide). Scrum + EPG was compared to Scrum EPG (a non-modified Scrum process also documented in an Electronic Process Guide). Thirty-two international academicians and practitioners, including experts and novices on agile practices, from Latin America, North America, and Asia-Pacific regions, evaluated six metrics of usability. A within-subjects design and Wilcoxon matched-pairs signed-rank tests were applied for collecting and analyzing the experimental data. The statistical results support the claim that the Scrum + EPG was considered a high-quality conciliated agile-rigorous software Project Management process for the Entry profile. Given the scarcity of similar studies and the need for reconciling agile-rigorous software development practices, this study contributes to a plausible solution for very small organizations. Finally, further empirical research is encouraged to confirm, update, and extend the results reported in this investigation.
机译:软件工艺标准和模型用于大型和中型组织,以到达铁三角形。相比之下,小而非常小的实体要么忽略它们,要么无法应用它们,因为这些标准和模型在技术上和经济上不可能。因此,敏捷软件开发实践通常由小型和非常小的组织使用。现在可以为非常小的组织提供ISO / IEC 29110系列标准和指南,但它们与敏捷实践的利用代表了敏捷性严谨性和解问题。在这项研究中,我们报告了Scrum + EPG的实验评估(来自Scrum的和解的敏捷严格的软件项目管理进程,以及ISO / IEC 29110系列入口配置文件的项目管理过程,记录在电子过程指南中)。将Scrum + EPG与Scrum EPG进行比较(在电子过程指南中还记录了未修改的Scrum过程)。来自拉丁美洲,北美和亚太地区的三十二名国际院士和从业者,包括关于敏捷实践的专家和新手,评估了六个可用性指标。在受试者内部设计和Wilcoxon匹配对签名 - 等级测试被应用用于收集和分析实验数据。统计结果支持Scrum + EPG被认为是入口配置文件的高质量抚摸敏锐的软件项目管理程序。鉴于类似研究的稀缺性和协调敏捷 - 严格的软件开发实践的需求,这项研究有助于为非常小型组织提供合理的解决方案。最后,鼓励进一步的实证研究确认,更新,并扩展在本调查中报告的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号