Cost Modeling of Distributed Team Processes for Global Development and Software-Intensive Systems of Systems

机译:全球开发和软件密集型系统的分布式团队流程的成本建模

获取原文
       

摘要

Distributed team processes are becoming more pervasive because of geographically distributed development and complex Software-Intensive Systems of Systems (SISOS) with many layers of breadth and depth. Software is developed collaboratively in multiple locations around the world, and projects are being contracted out in whole or in part for economic leverage. Systems are becoming larger and more complex, leading to distributed processes at many levels. Projects are often split among distributed teams, where the teams contribute different portions of work per phase to take advantage of their skill sets and rates. Thus there is a need for new parametric cost estimation models where effort multipliers are phase sensitive. Working with industrial partners, a set of constructive cost models have been extended to better estimate distributed teams where work is allocated by phase, rather than just along the lines of specific functionality. The distributed development models allow for work distribution by phase per team (and per module), different environmental characteristics of the teams, localized labor categories, calendars, compensation rates, and currencies for costing. They also use a generalized scheme for user-defined global life-cycle processes that include calibrated effort and schedule distributions. Representative examples show the models being used for global development and SISOS scenarios.
机译:由于地理上的分布式开发以及具有许多广度和深度层次的复杂软件密集型系统系统(SISOS),分布式团队流程正变得越来越普遍。软件是在全球多个地方协同开发的,项目的全部或部分承包是为了经济杠杆。系统正在变得越来越大,越来越复杂,从而导致了许多级别的分布式过程。项目通常分散在各个分布式团队中,其中团队在每个阶段贡献不同的工作部分,以利用其技能和速率。因此,需要其中乘数乘数是相位敏感的新的参数成本估计模型。与行业合作伙伴合作,已扩展了一组建设性成本模型,以更好地估计按阶段分配工作的分布式团队,而不仅仅是按照特定功能。分布式开发模型允许按团队(和每个模块)的阶段,团队的不同环境特征,本地化的劳动力类别,日历,补偿率和成本货币进行工作分配。他们还将通用方案用于用户定义的全局生命周期流程,其中包括校准的工作量和计划分配。代表性示例显示了用于全球开发和SISOS方案的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号