...
首页> 外文期刊>SNL Energy Coal Report >STB extends Tongue River coal rail comment period again amid local pushback
【24h】

STB extends Tongue River coal rail comment period again amid local pushback

机译:在当地人的反对下,STB再次延长了舌头河煤炭铁路的评论期

获取原文
获取原文并翻译 | 示例
           

摘要

The U.S. Surface Transportation Board has extended the commentrnperiod a second time for the proposed Tongue River Railroad inrnMontana as local groups and citizens, including members of thernCheyenne Nation, sound the alarm over the project’s potentialrncultural and environmental impacts.rnThe STB is taking comment on a draft environmental impactrnstatement for the project until Sept. 23, past a prior deadline of Aug.rn24 and an original cutoff of June 23. The draft EIS, which the STBrnreleased April 17, explored 11 alternatives for the railroad, includingrna no-action option. The Tongue River Railroad Co. Inc.’s preferredrnoption includes developing a $388 million, 42-mile rail line thatrnwould run between Colstrip, Mont., and the Ashland/Otter Creekrnareas in the southeastern part of the state. The line will initially servernArch Coal Inc.’s proposed 20 million-ton-per-year Otter Creek mine.
机译:美国地面运输委员会已经对拟议的舌头河铁路inmontana进行了第二次延长评论期,因为当地团体和公民,包括夏安民族的成员,对该项目的潜在文化和环境影响发出了警报。rnSTB正在对草案进行评论该项目的环境影响声明将一直持续到9月23日,之前的截止日期是8月24日,最初的截止日期是6月23日。STBrn在4月17日发布的EIS草案探讨了11种铁路替代方案,包括无动静选件。 Tongue River Railroad Co. Inc.的首选方案包括开发一条耗资3.88亿美元,长42英里的铁路线,该铁路线将在蒙大拿州的Colstrip和该州东南部的Ashland / Otter Creekrnareas之间运行。该生产线最初将服务于Arch Coal Inc.拟议的每年2000万吨的Otter Creek煤矿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号