首页> 外文期刊>Simulation >The system dynamics of Brooks' Law in team production
【24h】

The system dynamics of Brooks' Law in team production

机译:团队生产中布鲁克斯定律的系统动力学

获取原文
获取原文并翻译 | 示例
       

摘要

When a project is behind schedule, managers usually respond by bringing in additional workforce. Brooks' Law points out the systemic limits to staffing intervention, which are related to dynamic relationships between team buildup and loss of production due to communication and training overheads. ProjScout~™, a theoretical model of Brooks' Law, responds logically when input parameters are assigned extreme values and coherently sensitive to stepwise changes of input. Simulation experiments revealed relative inherent limits of staffing intervention, related to dynamic relationships between initial team size, training new team members, their learning curve, and productive time lost due to intercommunication. As a rule of thumb, Brooks' Law applies only when project resources are limited. The actual effect of investment in training, as well as concluding whether Brooks' Law applies in a particular case, can be modeled only when actual values of the productivity, communication entropy, and actual learning curve are known. ProjScout~™ can facilitate project decision-making in a wide range of production and service industries - wherever experienced performers have to divide their work time between production and other activities.
机译:当项目进度落后时,经理通常会通过增加人员来应对。布鲁克斯法则指出了人员干预的系统性限制,这与团队建设和由于沟通和培训开销而导致的生产损失之间的动态关系有关。 ProjScout〜™是布鲁克斯定律的理论模型,当输入参数被分配了极值并且对输入的逐步变化连贯敏感时,它会做出逻辑响应。模拟实验揭示了人员干预的相对固有局限性,这与初始团队规模,培训新团队成员,他们的学习曲线以及由于相互交流而损失的生产时间之间的动态关系有关。根据经验,布鲁克斯法则仅在项目资源有限时适用。仅当知道生产力,沟通熵和实际学习曲线的实际值时,才能对培训投资的实际效果以及得出在特定情况下是否适用布鲁克斯定律进行建模。 ProjScout〜™可以促进广泛的生产和服务行业的项目决策-经验丰富的演员必须将工作时间分配到生产和其他活动之间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号