...
首页> 外文期刊>Signal + Draht >CBTC to be installed between Malaysia and Singapore
【24h】

CBTC to be installed between Malaysia and Singapore

机译:CBTC要安装在马来西亚和新加坡之间

获取原文
获取原文并翻译 | 示例
           

摘要

Siemens Mobility has been awarded the contract to develop, install and commission a CBTC and platform screen door system for the Johor Bahru - Singapore rapid transit line. This is the first deployment of CBTC technology on a cross-border rail link. The four-kilometre line connecting Johor Bahru, Malaysia, and Woodlands, Singapore, is operated by RTS Operations, a joint venture between Singaporean rail operator SMRT and Malaysian transport company Prasarana. The Trainguard MT solution will be deployed to install CBTC on the line as well as at one station and one control centre (OCC) on both sides of the border, and the line will be equipped with GoA 4. In addition, platform screen doors will be installed at both stations; a depot will be set up on the Malaysian side to accommodate eight four-car trains. Once completed, the RTS line will be able to carry an estimated 10 000 passengers per hour and direction, which will help to relieve congestion at the existing border crossings, improve cross-border connections and boost economic activity in the region.
机译:西门子流动已被授予合同开发,安装和委员会为柔佛州的CBTC和平台屏幕门系统制定,为柔佛州 - 新加坡快速运输线。这是第一次部署CBTC技术在跨境导轨链路上。四公里线连接Johor Bahru,马来西亚和新加坡伍德兰兹,由RTS运营,新加坡铁路运营商SMRT和马来西亚运输公司Prasarana之间的合资。 Trainguard MT解决方案将部署以在边框的两侧安装在线以及一个站和一个控制中心(OCC),并将该线路配备GOA 4.此外,平台屏幕门将安装在两个站点;将在马来西亚方面设立仓库,以容纳八列四车列车。一旦完成,RTS系列将能够每小时估计10 000名乘客,这将有助于缓解现有的边境交叉口的拥堵,改善跨境连接和促进该地区的经济活动。

著录项

  • 来源
    《Signal + Draht》 |2021年第9期|69-69|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号