...
首页> 外文期刊>Signal + Draht >Signalling and train control with the wind at its back
【24h】

Signalling and train control with the wind at its back

机译:信号和火车控制随着风的背部

获取原文
获取原文并翻译 | 示例
           

摘要

Digitisation is causing significant winds of change in many industries. The digitisation of established system environments has always been at the centre of my activities during my ten years at Scheidt & Bachmann to date. A lot has happened during this period: all ticket information is now stored in the cloud rather than on the ticket. Point-of-sale systems run in a tablet PC browser. And a smartphone is all you need to pay your parking fee. At the beginning of last year, I was full of anticipation when I joined our signalling systems division. I quickly found out that the world of signalling and train control systems is genuinely unique! System generations spanning more than 100 years ensure the 24/7 operations of critical infrastructure. Safety as a precondition of everything we do was a new, very fundamental condition to me. There can be no doubt that the digitisation of entire signalling and train control system architectures constitutes a very special challenge.
机译:数字化导致许多行业的大量变化风。 在Scheidt&Bachmann迄今为止,在我的十年内,既定系统环境的数字化一直在我的活动中心。 在此期间发生了很大的事情:所有票证信息现在都存储在云中而不是在票证中。 销售点系统在平板电脑浏览器中运行。 和智能手机都需要支付停车费。 在去年年初,当我加入我们的信令系统部门时,我充满了期待。 我很快发现了信号和火车控制系统的世界是真正的独特! 系统世代跨越100多年,确保了24/7的关键基础架构的操作。 安全作为我们所做的一切的前提是对我来说是一种新的,非常基本的条件。 毫无疑问,整个信令和火车控制系统架构的数字化构成了非常特别的挑战。

著录项

  • 来源
    《Signal + Draht》 |2021年第9期|3-3|共1页
  • 作者

    Michael Lenders;

  • 作者单位

    Scheidt & Bachmann GmbH;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号