首页> 外文期刊>Shock and vibration >Behavior and Control of the Ballastless Track-Subgrade Vibration Induced by High-Speed Trains Moving on the Subgrade Bed with Mud Pumping
【24h】

Behavior and Control of the Ballastless Track-Subgrade Vibration Induced by High-Speed Trains Moving on the Subgrade Bed with Mud Pumping

机译:高速列车在路基泵上移动的高速列车磁力轨道路基振动的行为与控制

获取原文
获取原文并翻译 | 示例
           

摘要

This paper investigates behavior and control of the ballastless track-subgrade vibration induced by high-speed trains under mud pumping occurring in the subgrade bed. The characteristics of mud pumping occurring in the subgrade bed under the ballastless track structure are analyzed by visual observation and nondestructive testing. Then, based on the injection of the low-viscosity epoxy resin (LVER), the repair procedures for the mud pumping are proposed. A variety of on-site tests are performed on the ballastless track-subgrade with and without mud pumping and also after mud pumping reinforcement to analyze the vibration of the ballastless track-subgrade under the high-speed trains. The test results show that mud pumping can significantly increase the vertical vibration acceleration and displacement of the ballastless track structure and slightly decrease the vibration of subgrade surface. After mud pumping reinforcement, the abnormal vibration of the ballastless track-subgrade can be effectively controlled to make the vibration close to normal. In addition, the vibration ratio of the subgrade surface to the concrete base is proposed as a way to evaluate the effectiveness of the reinforcement of the mud pumping using the LVER, based on the vibration attenuation feature of the ballastless track-subgrade.
机译:本文调查了在路基床上发生的泥浆泵浦下高速列车诱导的碴轨道路基振动的行为和控制。通过视觉观察和非破坏性测试分析了在禁止轨道结构下的路基床上发生的泥浆泵的特性。然后,基于注射低粘度环氧树脂(LVER),提出了用于泥浆泵的修复程序。在禁止轨道路基上进行各种现场测试,在泥浆泵送和泥浆泵送加固后进行,分析高速列车下禁区轨道路基的振动。测试结果表明,泥浆泵可以显着提高无碴轨道结构的垂直振动加速度和位移,略微降低路基表面的振动。在泥浆泵送加固后,可以有效地控制碴轨道路基的异常振动,使振动接近正常。此外,提出了基于碴轨道路基的振动衰减特征来评估使用LVER的泥浆泵的加强泵的有效性的方式的振动比。

著录项

  • 来源
    《Shock and vibration》 |2019年第1期|9838952.1-9838952.14|共14页
  • 作者单位

    Southwest Jiaotong Univ Sch Civil Engn Chengdu 610031 Sichuan Peoples R China|Southwest Jiaotong Univ Key Lab High Speed Railway Engn Minist Educ Chengdu 610031 Sichuan Peoples R China;

    Southwest Jiaotong Univ Sch Civil Engn Chengdu 610031 Sichuan Peoples R China|Southwest Jiaotong Univ Key Lab High Speed Railway Engn Minist Educ Chengdu 610031 Sichuan Peoples R China;

    Southwest Jiaotong Univ Sch Civil Engn Chengdu 610031 Sichuan Peoples R China|Southwest Jiaotong Univ Key Lab High Speed Railway Engn Minist Educ Chengdu 610031 Sichuan Peoples R China;

    Southwest Jiaotong Univ Sch Civil Engn Chengdu 610031 Sichuan Peoples R China|Southwest Jiaotong Univ Key Lab High Speed Railway Engn Minist Educ Chengdu 610031 Sichuan Peoples R China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号