...
首页> 外文期刊>Screen Printing >TRACKING DOWNTIME ON THE PRODUCTION FLOOR
【24h】

TRACKING DOWNTIME ON THE PRODUCTION FLOOR

机译:在生产车间跟踪停机时间

获取原文
获取原文并翻译 | 示例
           

摘要

Most shop owners think that their plants operate fairly efficiently, but taking the time to monitor production downtime often shows otherwise. I've presented many seminars, done onsite consultations, and written several articles over the years discussing the challenge of doubling your screen-printing production in 30 days or less. No matter how efficient and on top of your game you are, I'm sure that you have the potential for this kind of production improvement in your facility. The first step in the process is to track your downtime.
机译:大多数车间所有者都认为他们的工厂运转相当有效,但是花时间监视生产停机通常会显示出其他问题。多年来,我已经举办了许多研讨会,进行了现场咨询并写了几篇文章,讨论了在30天或更短的时间内将丝网印刷产量提高一倍的挑战。无论您的游戏效率如何,您都可以在自己的工厂中进行这种生产改进。该过程的第一步是跟踪您的停机时间。

著录项

  • 来源
    《Screen Printing》 |2015年第1期|14-15|共2页
  • 作者

    Terry Combs;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号