The HTTR (High Temperature Engineering Test Reactor), with a thermal output of 30 MW, is a research facility constructed by the Japan Atomic Energy Research Institute. The view of the HTTR reactor building is shown in Fig. 1. The construction of the HTTR began in March 1991 and all major components were installed by March 1996. Fuels were loaded into the core since July 1998 and the first criticality was attained on November 10, 1998. Fuels were column-wide loaded from the outer fuel column to the inner one and 19 of the total 30 fuel columns made the reactor criticality. The other inner fuel columns were filled in to give the full size core by December 1998. In the course of fuel loading, low power physics tests were conducted.
机译:热输出功率为30 MW的HTTR(高温工程测试反应堆)是由日本原子能研究所建造的研究设施。 HTTR反应堆建筑物的视图如图1所示。HTTR的建造始于1991年3月,所有主要组件已于1996年3月安装。燃料从1998年7月开始装填到堆芯中,第一个临界点于11月达到1998年10月10日。从外部燃料塔到内部燃料塔的整个塔内装载燃料,总共30个燃料塔中的19个使反应堆处于临界状态。在1998年12月之前,将其他内部燃料塔填充为完整尺寸的堆芯。在燃料装载过程中,进行了低功率物理测试。

著录项

  • 来源
    《Science & Technology in Japan》 |2000年第73期|p.8-11|共4页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 自然科学总论;
  • 关键词

  • 入库时间 2022-08-18 01:34:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号