首页> 外文期刊>Science & Technology in Japan >The Taiwan High Speed Rail The World's Largest BOT Infrastructure Project
【24h】

The Taiwan High Speed Rail The World's Largest BOT Infrastructure Project

机译:台湾高铁全球最大的BOT基础设施项目

获取原文
获取原文并翻译 | 示例
       

摘要

The Taiwan High Speed Rail (Taiwan Shinkansen), which connects Taipei and Kaohsiung (distance: 345 km) in 90 minutes, is under steady construction to meet the scheduled commencement of the service in October 2005. Japanese Shinkansen 700 series trains (nicknamed "Nozomi" in Japan) will be delivered to Taiwan for the Taiwan Shinkansen on the basis of the core system contract signed in December 2000. Under the contract concluded by the Taiwan High Speed Rail Corporation (THSRC; Chairman and CEO: Nita Ing), primary contractor, and the Taiwan Shinkansen Corporation (Tokyo Headquarters; President: Kazuo Sato), a Japanese consortium consisting of seven companies: Mitsui & Co., Ltd., Mitsubishi Heavy Industries, Ltd., Toshiba Corp., Kawasaki Heavy Industries, Ltd., Mitsubishi Corp., Marubeni Corp. and Sumitomo Corp. will deliver, in addition to passenger cars, a signaling system, a communication system, and an operation control system. Technical support will be supplied by Central Japan Railway Co. and West Japan Railway Co.
机译:台湾高铁(台湾新干线)在90分钟内连接台北和高雄(距离:345公里),目前正在稳定建设中,以配合预定于2005年10月开始的服务。日本新干线700系列列车(昵称“ Nozomi” ”将在2000年12月签署的核心系统合同的基础上交付给台湾,以进行台湾新干线。根据台湾高铁公司(THSRC;董事长兼首席执行官:Nita Ing)(主要承包商)签订的合同,以及由七家公司组成的日本财团台湾新干线公司(东京总部;总裁:佐藤一雄),三井物产株式会社,三菱重工业株式会社,东芝公司,川崎重工业株式会社,除了乘用车外,三菱公司,丸红公司和住友公司还将提供信号系统,通信系统和操作控制系统。技术支持将由日本中央铁路公司和西日本铁路公司提供。

著录项

  • 来源
    《Science & Technology in Japan》 |2002年第82期|p.16-19|共4页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 自然科学总论;
  • 关键词

  • 入库时间 2022-08-18 01:33:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号