In traditional building contracts, the architect has always wielded a high degree of power. The role of the architect as 'certifier' under the contract ensures they are the key decision maker in deciding when the building is complete, and in deciding the contractor's entitlements to further time or money. Not least among all the certificates which an architect issues under a typical JCT contract are the interim certificates of payment during the course of the job and the final certificate of payment at the end of the job. A recent case has shown that these two certificates are radically different documents, and each gives a separate right to a contractor to sue for the sum stated in that certificate.
机译:在传统的建筑合同中,建筑师始终运用着很高的权力。合同中建筑师作为“证明人”的角色确保了他们是决定建筑物何时建成以及决定承包商是否有时间或金钱的权利的关键决策者。建筑师根据典型的JCT合同签发的所有证书中,尤其重要的是工作过程中的临时付款证书和工作结束时的最终付款证书。最近的一个案例表明,这两个证书是根本不同的文件,并且每个证书都赋予承包商以该证书中所述的金额提出起诉的单独权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号