首页> 外文期刊>RIBA Journal >Oma In The Loop
【24h】

Oma In The Loop

机译:奥玛在循环

获取原文
获取原文并翻译 | 示例
           

摘要

Well, it finally got there. Plum in the middle of Beijing and just in time for the Olympics last month, the external cladding to OMA's CCTV HQ is complete. Looking like a Chinese puzzle and enclosing 473,000 m~2 of space, the principle was to merge all the disparate functions of television production into one three-dimensional loop. But if it's finished, how come it looks like someone's forgotten to join up the cladding lines all over the building, or at the very least had a hard night on the baijou before they decided to fix it? The answer is that there's a hangover of sorts involved, but not of the alcoholic variety. This one is the perilous-looking overhang that starts on the 36th floor and rises from 9 to 14 storeys as it links the building's two leaning towers.
机译:好吧,它终于到了。梅花在北京中部,正好在上个月奥运会举行之际,OMA CCTV总部的外部建筑已完成。看起来就像一个中国难题,并围绕着473,000 m〜2的空间,其原理是将电视制作的所有不同功能合并为一个三维环。但是,如果完成了,看起来好像有人忘记了整个建筑物的覆层线,或者至少在决定修复之前在白酒上度过了辛苦的夜晚?答案是,这里涉及各种宿醉,但不涉及酒类。这是一个危险的悬挑建筑,始于36层,从9层上升到14层,与建筑的两个斜塔相连。

著录项

  • 来源
    《RIBA Journal》 |2008年第9期|p.12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号