Abst'/> Storage sizing for grid connected hybrid wind and storage power p1ants taking into account forecast errors autocorrelation
首页> 外文期刊>Renewable energy >Storage sizing for grid connected hybrid wind and storage power p1ants taking into account forecast errors autocorrelation
【24h】

Storage sizing for grid connected hybrid wind and storage power p1ants taking into account forecast errors autocorrelation

机译:考虑预测误差自相关的并网风电和储能电站的储能规模

获取原文
获取原文并翻译 | 示例
       

摘要

AbstractThis paper describes a research on the influence of wind power prediction error autocorrelation on the sizing of storage coupled with a wind farm.The stochastic nature of renewable energies resources such as wind speed or solar radiation represents a challenge for the grid integration of renewable energy plants. The imbalances between renewable power predictions and realised production are generally penalised by system operators since additional reserves are required to maintain the stability of the grid. The coupling of storage devices with renewable energy plants is one of the solutions studied to reduce those imbalances. In this work, a methodology to manage imbalances and to size storage in order to achieve a determined level of controllability is proposed. It is applied to a specific use case: the integration of a combined wind-storage plant in French Guyana. The influence of the autocorrelations of errors on the battery size is investigated in detail and a methodology for producing wind prediction errors time series is presented.HighlightsContext: A hybrid wind-storage power plant optimise operation with forecasts.Context: Forecast errors present autocorrelation, needing larger batteries.Problem: how errors autocorrelation influences storage sizing?Solution: developed a methodology creating auto-correlated forecast errors.Solution: developed a methodology for storage sizing.
机译: 摘要 本文介绍了风能预测误差自相关对风电场存储容量的影响的研究。 风速或太阳辐射等可再生能源资源的随机性对可再生能源工厂的电网整合提出了挑战。系统运营商通常会惩罚可再生能源发电量预测与实际生产之间的不平衡,因为需要额外的储备来维持电网的稳定性。存储设备与可再生能源工厂的耦合是为减少这些不平衡而研究的解决方案之一。在这项工作中,提出了一种管理不平衡和确定存储大小以实现确定的可控性的方法。它适用于特定的用例:在法属圭亚那整合了一家联合储风电厂。详细研究了误差的自相关对电池尺寸的影响,并提出了产生风向预测误差时间序列的方法。 突出显示 上下文:混合型风力发电厂通过预测优化运行。 上下文:预测误差存在自相关,需要更大的电池。 问题:错误自相关如何影响存储大小? 解决方案:开发了一种创建与自动相关的预测错误的方法。 解决方案:开发了一种存储大小调整方法。

著录项

  • 来源
    《Renewable energy》 |2018年第3期|380-392|共13页
  • 作者单位

    MINES ParisTech, PSL - Research University, PERSEE - Centre for Processes, Renewable Energies and Energy Systems;

    MINES ParisTech, PSL - Research University, PERSEE - Centre for Processes, Renewable Energies and Energy Systems;

    MINES ParisTech, PSL - Research University, PERSEE - Centre for Processes, Renewable Energies and Energy Systems;

    MINES ParisTech, PSL - Research University, PERSEE - Centre for Processes, Renewable Energies and Energy Systems;

    MINES ParisTech, PSL - Research University, PERSEE - Centre for Processes, Renewable Energies and Energy Systems;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Wind; Forecast; Storage; Sizing;

    机译:风;预测;存储;大小调整;
  • 入库时间 2022-08-18 00:24:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号