首页> 外文期刊>Reliability Engineering & System Safety >Reply to 'Comment on: Development of a safety critical software requirements verification method with combined CPN and PVS: a nuclear power plant protection system application'
【24h】

Reply to 'Comment on: Development of a safety critical software requirements verification method with combined CPN and PVS: a nuclear power plant protection system application'

机译:回复“评论:结合CPN和PVS开发安全关键软件需求验证方法:核电站保护系统应用程序”

获取原文
获取原文并翻译 | 示例
       

摘要

Kim and Cha recently issued a correspondence on an article that we have published. In their correspondence, they pointed out that the translation algorithm from CPN model to PVS specification needs to properly handle initial markings and to correctly reflect the firing rule of the CPN. In addition, Kim and Cha found a few errors such as misuse of timing constraints in the CPN model, wrong variable declaration and incorrect bounding through the quantifier FORALL. Accordingly, we try to reply to their comments and suggest future work to improve our research.
机译:Kim和Cha最近就我们发表的文章发表了一封信函。在他们的对应中,他们指出,从CPN模型到PVS规范的转换算法需要正确处理初始标记并正确反映CPN的触发规则。此外,Kim和Cha发现了一些错误,例如CPN模型中时序约束的滥用,错误的变量声明以及通过量词FORALL的错误边界。因此,我们尝试回复他们的评论,并提出未来的工作以改进我们的研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号