...
首页> 外文期刊>Renewable energy focus >Green light for Scottish renewable energy projects
【24h】

Green light for Scottish renewable energy projects

机译:苏格兰可再生能源项目开绿灯

获取原文
获取原文并翻译 | 示例
           

摘要

Official consent has been granted for a 20-turbine wind farm at Moy, near Inverness, and a combined heat and power bio-mass plant for the Port of Rosyth. The Moy wind farm, which represents a £65 million investment by developer Eneco Wind UK Ltd, will have 20 turbines with a generating capacity of up to 66MW. When completed, it could power the equivalent of approximately 31,000 homes in the area, officials said. The Rosyth plant, a £325 million investment by Forth Energy, would provide low carbon energy to the local area, and the equivalent of more than 40 per cent of the Fife Council area's electricity needs would be met by the development.
机译:官方同意在因弗内斯附近的Moy建造20座涡轮风力发电场,并为Rosyth港口建设热电联产生物质发电厂。莫伊风电场由开发商Eneco Wind UK Ltd投资6,500万英镑,将拥有20台涡轮机,发电量高达66MW。官员说,完成后,它可以为该地区约31,000户房屋供电。 Rosyth工厂由Forth Energy投资3.25亿英镑,将为当地提供低碳能源,该开发项目将满足Fife委员会地区40%以上的电力需求。

著录项

  • 来源
    《Renewable energy focus》 |2014年第1期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号