It really doesn't seem to matter which of our seminars I present, the contractor's question is always the same: "What key pieces of information do we need to track to know whether we are on target?"In order to answer that question we need to make a baseline assumption or two. The most important is you have put a budget together that not only includes your overhead costs but also the estimated number of hours you expect to sell (or will need to sell) to meet that budget. Assuming the budgets have been developed, by department, there are three major pieces of information that need to be tracked each month. If you can accurately track these three things, however, most everything else will pretty much fall into place.
机译:我现在在哪个研讨会上似乎都没关系,承包商的问题始终是相同的:“我们需要跟踪哪些关键信息才能知道我们是否达到目标?”为了回答这个问题,我们需要做出一两个基准假设。最重要的是,您已将预算汇总在一起,不仅包括间接费用,还包括您期望出售(或需要出售)以达到该预算的估计小时数。假设预算是按部门制定的,则每月需要跟踪三个主要信息。但是,如果您可以准确地跟踪这三件事,则几乎所有其他事情都会落到位。

著录项

  • 来源
    《Reeves journal》 |2011年第9期|p.66-67|共2页
  • 作者

    Tom Grandy;

  • 作者单位

    president of Grandy & Associates, 1020 Halifax Drive, Suite 102, Owensboro;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号