首页> 外文期刊>Reactive & Functional Polymers >Continuous removal of copper ions from dilute feed streams using magnetic weak-base anion exchangers in a continuous stirred tank reactor (CSTR)
【24h】

Continuous removal of copper ions from dilute feed streams using magnetic weak-base anion exchangers in a continuous stirred tank reactor (CSTR)

机译:在连续搅拌釜式反应器(CSTR)中使用弱磁性阴离子交换剂从稀进料流中连续去除铜离子

获取原文
获取原文并翻译 | 示例

摘要

The continuous removal of copper ions from dilute feed streams by means of magnetic weak-base anion exchangers is studied experimentally and theoretically. After determining the respective equilibrium and kinetic parameters in initial batch experiments, pilot plant experiments were conducted with up to 0.4 m~3/h throughput. The main parts of the pilot plant are a 0.12 m~3 continuous stirred tank reactor (CSTR) for continuous copper ion removal, a settling tank in which the magnetic micro ion exchangers agglomerate and rapidly settle, and a reaction vessel for cyclic regeneration of the spent resin. With this set-up, continuous copper removal efficiencies of up to 70% could be achieved in the case of a 0.2 m~3/h feed stream containing 0.145 eq/m~3 copper ions. In addition to the experimental investigations, a theoretical model was developed, which allows for the prediction of the pilot plant performance. Using a modified shell-core approach for the sorption kinetics in combination with the mass balances for a CSTR, the difference between the measured and predicted effluent concentrations was less than 10% in all cases examined. For the formulation of the model equations, two dimensionless numbers were defined for an easy identification of the bottlenecks of the process. The influences of process parameters like resin dosage, CSTR volume or resin particle diameter on the removal efficiency is discussed using these dimensionless numbers.
机译:实验上和理论上研究了利用弱磁性阴离子交换剂从稀进料流中连续去除铜离子的方法。在初始批处理实验中确定了各自的平衡和动力学参数后,以高达0.4 m〜3 / h的生产量进行了中试工厂实验。中试装置的主要部件是用于连续去除铜离子的0.12 m〜3连续搅拌釜反应器(CSTR),在其中装有磁性微离子交换剂并迅速沉降的沉降罐以及用于循环再生铜的反应容器。废树脂。通过这种设置,在0.2 m〜3 / h的进料流中包含0.145 eq / m〜3铜离子的情况下,可以达到高达70%的连续铜去除效率。除了实验研究之外,还开发了理论模型,该模型可以预测中试装置的性能。使用改进的壳核方法进行吸附动力学,结合CSTR的质量平衡,在所有检查的情况下,测得的污水浓度和预计的污水浓度之间的差异均小于10%。为了建立模型方程式,定义了两个无量纲数,以便于识别过程的瓶颈。使用这些无量纲数讨论了工艺参数(如树脂用量,CSTR体积或树脂粒径)对去除效率的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号