首页> 外文期刊>RAIRO Operation Research >THE PRODUCTION PLANNING PROBLEM OF ORDERS IN SMALL FOUNDRIES
【24h】

THE PRODUCTION PLANNING PROBLEM OF ORDERS IN SMALL FOUNDRIES

机译:小基金会的订单生产计划问题

获取原文
获取原文并翻译 | 示例
       

摘要

The production planning problem in market-driven foundries consists of determining the alloys to be melted and the items to be produced. A production plan is defined based on the foundry book order that compiles customer requests. Each customer order can be composed of items of different types and made from different alloys. In the literature, production planning does not usually consider the customers' orders, i.e., items are independently handled. However, in practical situations, several orders cannot be partially delivered. An order can be delivered only when all of its items have been produced, which often results in delays in meeting the customer demands. Conversely, some orders may be split, which would incur delivering costs. This paper addresses the production planning problem of orders in market-driven foundries, which is considered a gap in the literature. A mathematical model and a relax-and-fix heuristic are proposed to address the problem. An experimental evaluation using synthetic datasets and a real dataset compares the proposed methods with the practical policy planning and a state-of-the-art method that solve the production planning problem of items. The results demonstrate the relevance of the production planning of orders.
机译:市场驱动型铸造厂的生产计划问题包括确定要熔化的合金和要生产的物品。根据汇编客户要求的代工订单定义生产计划。每个客户订单都可以由不同类型的项目组成,并由不同的合金制成。在文献中,生产计划通常不考虑客户的订单,即项目是独立处理的。但是,在实际情况下,无法部分交付多个订单。订单只有在其所有物品均已生产时才能交付,这通常会导致满足客户需求方面的延迟。相反,某些订单可能会被拆分,这将导致交付成本。本文解决了市场驱动型铸造厂的订单生产计划问题,这在文献中被认为是空白。为解决该问题,提出了数学模型和松弛固定启发法。使用综合数据集和真实数据集进行的实验评估将提出的方法与实际的政策计划和解决项目生产计划问题的最新方法进行了比较。结果证明了订单生产计划的相关性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号