首页> 外文期刊>Railway Track and Structures >Mechanized campaigns battle Winter woes
【24h】

Mechanized campaigns battle Winter woes

机译:机械化的战役与冬季的困境作斗争

获取原文
获取原文并翻译 | 示例
       

摘要

Just as the snow melted and disap- peared, railroads began their next- Winter preparations. Below is a look at what several Class 1, regional and commuter railroads have planned for Winter 2001-2002. The past Winter for Canadian National was a tale of two Winters. The eastern half of the network steadily received snow with no typical thaws, resulting in above-average snow accumulation. The western half of the network received below-average snowfall and above average temperatures, so this Winter was not as big a challenge for the western half as many previous ones.
机译:就在雪融化和消失的时候,铁路开始了下一个冬季的准备工作。下面是2001-2002年冬季计划的几条1级区域铁路和通勤铁路的规划图。加拿大国民队过去的冬天是两个冬天的故事。该网络的东半部稳定地接收到雪,没有典型的解冻,导致积雪高于平均水平。网络的西半部降雪量低于平均水平且气温高于平均水平,因此,今年冬天对西半部的挑战并不像以前的多。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号