首页> 外文期刊>Railway Track and Structures >Silver Line reaches 'substantial completion,' MWAA receives approval of nearly $1.9 billion TIFIA loan
【24h】

Silver Line reaches 'substantial completion,' MWAA receives approval of nearly $1.9 billion TIFIA loan

机译:Silver Line达到“实质性完成”,MWAA获得TIFIA贷款近19亿美元的批准

获取原文
获取原文并翻译 | 示例
       

摘要

The Metropolitan Washington Airports Authority (MWAA) was approved by the US Department of Transportation (USDOT) for a nearly $1.9 billion Transportation Infrastructure Finance and Innovation Act (TIFIA) loan for the Dulles Corridor Metrorail Project. MWAA applied for the loan in conjunction with its local partners on the Metrorail Project, Fairfax County and Loudoun County.
机译:华盛顿大都会机场管理局(MWAA)已获得美国运输部(USDOT)的批准,为杜勒斯走廊地铁项目提供了近19亿美元的运输基础设施金融与创新法案(TIFIA)贷款。 MWAA与当地合作伙伴在Metrorail项目,Fairfax县和Loudoun县申请了贷款。

著录项

  • 来源
    《Railway Track and Structures》 |2014年第5期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:24:15
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号