首页> 外文期刊>Railway Track and Structures >CAPITAL SQUEEZE STILL PRODUCES A SILVER LINE-ING
【24h】

CAPITAL SQUEEZE STILL PRODUCES A SILVER LINE-ING

机译:资金紧缩仍会产生银线

获取原文
获取原文并翻译 | 示例
       

摘要

Whether it was from allowable work windows, a project time frame or workable space, constriction seems to be a recurring theme in the National Railroad Construction and Maintenance Association's (NRC) 2013 Railroad Construction Project of the Year, as well as the ability of the award recipient, Delta Railroad Construction, Inc., to be pliant and resilient to each project obstacle. Delta took on the largest project in company history when it was awarded the $81-million trackwork contract for the first phase of the Dulles Corridor Metro Rail Project. The scope of work called for Delta to install more than 400,000 linear feet of track, as well as 11 crossovers and 17 turnouts over two-years. But, as is often the case in construction, that time frame was reduced...by half.
机译:无论是在允许的工作窗口内,在项目时限内还是在可使用的空间内,收缩都是美国国家铁路建设与维修协会(NRC)年度铁路建设项目2013年的主题,并且屡获殊荣接收者,三角洲铁路建设公司,要对每个项目障碍保持柔韧性和韧性。达美航空获得了公司历史上最大的项目,获得了杜勒斯走廊地铁铁路项目第一阶段的八千一百万美元的轨道工程合同。工作范围要求达美航空在两年内安装超过40万直线英尺的轨道,以及11个交叉路口和17个道岔。但是,在施工中通常会减少一半的时间。

著录项

  • 来源
    《Railway Track and Structures》 |2014年第5期|18-2022-23|共5页
  • 作者

    Mischa Wanek-Libman;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:24:14

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号