...
首页> 外文期刊>Rail >Spoil train departs Willesden Logistics Hub
【24h】

Spoil train departs Willesden Logistics Hub

机译:宠物火车出发威尔斯登物流枢纽

获取原文
获取原文并翻译 | 示例

摘要

The first train carrying 1,470 tonnes of spoil from HS2 construction work in London left the Willdesden Logistics Hub on June 29. Departing at 0351 the train, operated by GB Railfreight, travelled to Barrington (Cambridgeshire), where the spoil will be reused in a disused quarry to help bring the site back into use as a new housing development. Up to seven freight trains per day will leave the hub, removing one million lorries from the roads in the London area alone. One train per day will also arrive at the hub, bringing construction materials including concrete segments that are being used to build the HS2 tunnels. HS2 LTD.
机译:伦敦HS2施工工作中携带1,470吨腐败的火车将于6月29日离开Willdesden Logistics Hub.从GB Railfreight运营的火车出发,前往Barrington(剑桥郡),弃土将在废弃的地方重复使用 采石场帮助将网站带回用作新的住房开发。 每天最多七次运费将离开枢纽,仅从伦敦地区的道路上移除一百万个卡车。 每天每天的火车也将于枢纽到达,带来建筑材料,包括用于构建HS2隧道的混凝土段。 HS2 LTD。

著录项

  • 来源
    《Rail》 |2021年第935期|23-23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号