Seven of the 14 recommendations made by the National Audit Office on the HS2 project in 2016 and 2020 have been implemented. Reporting on progress in June, the NAO explained that some of the outstanding points cannot be implemented "until later in the programme and after key decisions about scope have been made". The recommendations were made to HS2 and the Department for Transport. All have been accepted. In 2016, the NAO examined preparations for HS2 and found that "HS2 had struggled to meet the overly ambitious timetable set for it by the Department" and that the "programme faced cost and schedule pressures". Observations in the subsequent 2020 report included that HS2 Ltd and the DfT "had underestimated the programme's complexity".
机译:全国审计署于2016年和2020年的国家审计署项目提出的14项建议中有七项实施。 报告六月进展情况下,NAO解释说,一些未杰出的积分无法实施“直到稍后在方案后期,并在对范围的关键决定之后”。 向HS2和运输部提出的建议。 所有人都被接受了。 2016年,NAO检查了HS2的准备,发现“HS2努力通过该部门迎接过上雄心勃勃的时间表”,“计划面临成本和日程压力”。 随后的2020年报告中的观察包括HS2 LTD和DFT“已经低估了该计划的复杂性”。

著录项

  • 来源
    《Rail》 |2021年第934期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号