首页> 外文期刊>Rail >SWR plans early summer debut for delayed Arterios
【24h】

SWR plans early summer debut for delayed Arterios

机译:SWR计划初夏首次亮相延迟动脉

获取原文
获取原文并翻译 | 示例
           

摘要

RAIL Minister Chris Heaton-Harris confirmed on January 21 that the first South Western Railway Class 701 Arterios are now expected to be in traffic from early summer, although even that depends upon testing and no more COVID-related problems.SWR has 90 Class 701 electric multiple units on order from Bombardier (60 ten-car and 30 five-car trains), with the first originally planned to have entered traffic in late 2019.But by mid-January, fewer than half of the 701s' had been built by Bombardier at Derby Litchurch Lane.In a Commons Written Reply to Shadow Transport Minister Tan Dhesi, Heaton-Harris said: "The first of the new Class 701 trains is expected to be in passenger service from early summer this year, with the full fleet to be deployed in passenger service over the following 12 months, enabling the cascade of the current fleets out of South Western Railway on a like-for-like basis as the new trains enter passenger service.
机译:铁路部长Chris Heaton-Harris于1月21日确认,第一个南方铁路701级动脉现在预计将在初夏的交通中,尽管甚至取决于测试,而且没有更多的Covid相关问题.SWR拥有90级701电机 从庞巴迪(60辆车和30辆五辆车列车)订购的多个单位,最初计划于2019年底进入交通。但是在1月中旬,庞巴迪建造了较少的701年代 在Derby Litchurch Lane.IN的帖子写对影子运输部长Tan Dhesi,Heaton-Harris表示:“预计今年初夏的乘客服务中的第一个列车将在夏季乘客服务 在接下来的12个月内部署了乘客服务,使当前车队的级联在南部铁路上,就像新的火车进入乘客服务一样。

著录项

  • 来源
    《Rail》 |2021年第924期|28-29|共2页
  • 作者

    Richard Clinnick;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号