首页> 外文期刊>Rail >Chiltern Railways sends replacement Mk 3s for storage
【24h】

Chiltern Railways sends replacement Mk 3s for storage

机译:Chiltern铁路发送更换MK 3S进行存储

获取原文
获取原文并翻译 | 示例
           

摘要

A rake of former Greater Anglia Mk 3s that had been destined for Chiltern Railways has instead been sent for storage at Long Marston, having never entered service. They were leased from Porterbrook to cover for CR's final slam-door Mk 3 set, which was used on Marylebone-Banbury trains. The ex-GA stock was more accessible than that it was replacing and arrived at Eastleigh Works for refurbishment and relivery last year. But having received CR's branding, the stock was instead deemed redundant.
机译:借用已经为Chiltern Railways注定的前更大的Anglia MK 3S已经在Long Marston寄存来存储,从未进入过服务。 他们从Porterbrook租赁到CR的最终奴隶门MK 3套装,用于Marylebone-Banbury火车。 ex-ga股票比在去年更换和抵达伊斯特利工程以进行翻新和发布的股票股票。 但收到了CR的品牌,股票被认为是多余的。

著录项

  • 来源
    《Rail》 |2021年第930期|28-28|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号