...
首页> 外文期刊>Rail >All eyes are on HS2's eastern leg
【24h】

All eyes are on HS2's eastern leg

机译:所有的眼睛都在HS2的东部腿上

获取原文
获取原文并翻译 | 示例
           

摘要

With shovels in the ground at more than 200 separate work sites, HS2 Phase 1 is now not only emerging from the ground, it will be burrowing beneath it in early 2021, when tunnelling starts beneath the Chilterns. So, London-Birmingham is secure and happening. But what about north of Curzon Street, to Manchester via Lichfield and Crewe, and (crucially) the eastern arm through the long-neglected East Midlands? I immediately detect a certain distancing by HS2 from some proposed aspects of the scheme. This applies ever more to the eastern leg (but I'll come back to that). Thurston explains: "We are now - as HS2 Ltd - developing legislation for the western leg all the way into Manchester Piccadilly.
机译:通过在200多个单独的工作场所的地面上的铲子,HS2阶段1现在不仅从地面出现,它将在2021年初挖洞,当隧道在智霉下开始时。所以,伦敦 - 伯明翰确保并发生了。但是北北北北部的曼彻斯特到曼彻斯特·克里德菲尔德和克鲁德,(至关重要地)东部武器,通过长期被忽视的米德兰兹?我立即通过该方案的一些拟议方面来检测HS2的一定偏移。这适用于东腿(但我会回到那个)。瑟斯顿解释道:“我们现在 - 作为HS2 LTD - 一直进入曼彻斯特皮卡迪利的西方腿的立法。

著录项

  • 来源
    《Rail》 |2021年第921期|28-33|共6页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号