首页> 外文期刊>Rail >Hopes rekindled of full MML electrification
【24h】

Hopes rekindled of full MML electrification

机译:希望重燃全MML电气化

获取原文
获取原文并翻译 | 示例
           

摘要

ELECTRIFYING the entire Midland Main Line could be back on the agenda. The scheme was originally confirmed in 2012, only for Government to cancel electrification north of Kettering/ Corby in July 2017, stating that bi-mode trains would be ordered instead. Electrification was later extended to Market Harborough, but politicians have routinely called for the wires to serve Nottingham, Derby and Sheffield as originally planned. During a House of Commons debate on transport on September 17, HS2 Minister Andrew Stephenson said in response to a question from Alex Norris (Labour/ Co-op, Nottingham North): "We are currently delivering the Midland Main Line upgrade, which includes electrification from London to Kettering, with additional electrification to Market Harborough being developed. "Further electrification of the MML is currently at an early stage, but it is being examined by Network Rail."
机译:致电整个米德兰主线可以回到议程。该计划最初于2012年确认,仅为政府在2017年7月取消Kettering / Corby北部的电气化,指出将订购双模列车。电气化后来延伸到市场哈巴息,但政治家经常呼吁电线为诺丁汉,德比和谢菲尔德提出原本计划的。 HS2议员于9月17日的公共汽车辩论期间,HS2 Andrew Stephenson表示回应Alex Norris(劳工/共同劳动,诺丁汉北)的问题:“我们目前正在提供米德兰的主线升级,包括电气化从伦敦到肯特,额外的电气化向市场遭到开发的市场。“MML的进一步电压目前在早期阶段,但它正在通过网络轨道检查。”

著录项

  • 来源
    《Rail》 |2020年第915期|28-29|共2页
  • 作者

    Richard Clinnick;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号