...
首页> 外文期刊>Rail >South Western Wessex Electrics finally in service
【24h】

South Western Wessex Electrics finally in service

机译:西南威塞克斯电气公司终于投入使用

获取原文
获取原文并翻译 | 示例
           

摘要

SOUTH Western Railway introduced a pair of five-car Wessex Electrics into passenger service on June 10, with 442410 and 442420 forming the 0628 Southampton Airport Parkway to London Waterloo. The fleet of 18 trains had originally been promised last autumn. Last month SWR suddenly withdrew the fleet of refurbished 30-year-old trains because of a safety issue with the door locking system. It did so just four days before they were due to start carrying passengers with the May timetable change.
机译:SOUTH Western Railway于6月10日将一对五车厢的Wessex Electrics引入客运服务,其中442410和442420构成了通往伦敦滑铁卢的0628南安普敦机场大路。最初于去年秋天承诺提供18列火车。上个月,由于门锁系统存在安全问题,SWR突然撤出了已翻新30年的火车车队。这样做是在五月份的时间表变更之前,他们将要开始载客的四天。

著录项

  • 来源
    《Rail》 |2019年第881期|26-26|共1页
  • 作者

    Paul Clifton;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号