...
首页> 外文期刊>Rail >New lifts installed at Hebden Bridge
【24h】

New lifts installed at Hebden Bridge

机译:赫布登大桥安装了新电梯

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Network Rail has installed lifts at Hebden Bridge, as part of a £2.2 million programme to improve access at the station. It has also resurfaced the walkway at the entrance to the station. "Station users should really notice a difference at Hebden Bridge, now we have finished the work to improve accessibility at the station," said Rob Mclntosh, Network Rail's London North Eastern and East Midlands Route Managing Director. "The enhanced accessibility creates a more modern station that is better placed to meet the needs of the local community. Station users should now have a much better customer experience."
机译:Network Rail已在赫布登大桥安装了升降机,这是一项220万英镑的计划的一部分,目的是改善车站的出入口。它还在车站入口处重新铺设了人行道。 Network Rail伦敦东北和东米德兰兹郡路线董事总经理Rob Mclntosh说:“车站用户应该真的注意到赫布登大桥的变化,现在我们已经完成了改善车站可及性的工作。” “增强的可访问性创建了一个更现代的站点,可以更好地满足本地社区的需求。站点用户现在应该拥有更好的客户体验。”

著录项

  • 来源
    《Rail》 |2019年第876期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号