【24h】

EXPERTANSWERS

机译:专家

获取原文
获取原文并翻译 | 示例
       

摘要

Q: Which is the right way to deploy Six Sigma initiatives:1. Set up a separate Six Sigma department headed by a newly created Six Sigma manager or site deployment manager, with all Black Belts (BB) being a part of this department.2. Keep all BBs in their original departments, and have them report to their department managers, as well as Six Sigma leadership, which is not a newly created position, but instead is an existing manager who takes this task asan additional responsibility. This way, management can leverage BB resources organizationwide based on need.
机译:问:部署六个西格玛计划的正确方法是:1。设立一个单独的六西格码部门,由新创建的六西格码经理或站点部署经理领导,所有黑带(BB)都属于该部门。将所有BB保留在其原始部门中,并让他们向部门经理以及六个西格玛领导层汇报,这不是一个新成立的职位,而是现有的经理,他将这项任务作为额外的责任。这样,管理层可以根据需要在组织范围内利用BB资源。

著录项

  • 来源
    《Quality progress》 |2012年第4期|p.8-9|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:38:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号