首页> 外文期刊>Quality Control, Transactions >Efficiency-Oriented Production Scheduling Scheme: An Ant Colony System Method
【24h】

Efficiency-Oriented Production Scheduling Scheme: An Ant Colony System Method

机译:以效率为导向的生产调度方案:蚁群系统方法

获取原文
获取原文并翻译 | 示例
       

摘要

During the real production system, the scheduling scheme change is mostly changed by dynamic events or new tasks. Due to the different urgency degrees of dynamic events, the corresponding scheduling methods should be adopted to ensure the production efficiency of enterprises. In this paper, an event-driven dynamic workshop scheduling model is established based on Ant Colony System (ACS), and two scheduling methods are designed to deal with dynamic events, namely parallel scheduling and parallel priority scheduling, respectively. The goal of parallel scheduling is to minimize the total makespan, while that of parallel priority scheduling is to minimize the delivery time of dynamic events. Additionally, a selective scheduling strategy is designed to determine the optimal scheduling method according to the urgency degree of dynamic events. Finally, the feasibility of the selective scheduling strategy in solving the dual-objective dynamic job shop scheduling problem (DJSP) is verified by an example experiment on DJSP as well as a large scale problem test set.
机译:在实际生产系统期间,调度方案变化主要由动态事件或新任务更改。由于不同的动态事件的紧急程度,应采用相应的调度方法来确保企业的生产效率。在本文中,基于蚁群系统(ACS)建立了事件驱动的动态车间调度模型,并且设计了两个调度方法来处理动态事件,即并行调度和并行优先级调度。并行调度的目标是最小化总制造商,而并行优先调度的虽然该并行优先级调度是最小化动态事件的传递时间。另外,选择性调度策略旨在根据动态事件的紧急程度来确定最佳调度方法。最后,通过DJSP上的示例实验以及大规模问题测试集来验证在解决双目标动态作业商店调度问题(DJSP)时选择性调度策略的可行性。

著录项

  • 来源
    《Quality Control, Transactions》 |2020年第2020期|19286-19296|共11页
  • 作者单位

    Nanjing Xiaozhuang Univ Sch Environm Sci Nanjing 211171 Peoples R China|Jiangsu Shentong Valve Co Ltd Nantong 226232 Peoples R China|Southeast Univ Sch Mech Engn Nanjing 211189 Peoples R China|Sanjiang Univ Sch Mech & Elect Engn Nanjing 210012 Peoples R China;

    Sanjiang Univ Sch Mech & Elect Engn Nanjing 210012 Peoples R China;

    Jiangsu Shentong Valve Co Ltd Nantong 226232 Peoples R China;

    Southeast Univ Sch Mech Engn Nanjing 211189 Peoples R China|Sanjiang Univ Sch Mech & Elect Engn Nanjing 210012 Peoples R China;

    Sanjiang Univ Sch Mech & Elect Engn Nanjing 210012 Peoples R China|Nanjing Univ Aeronaut & Astronaut Sch Astronaut Nanjing 211189 Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Job shop scheduling; ant colony system; dynamic scheduling; event-driven;

    机译:工作商店调度;蚁群系统;动态调度;事件驱动;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号