...
首页> 外文期刊>Pulp and Paper >Irving Pulp and Paper to upgrade Saint John pulp mill
【24h】

Irving Pulp and Paper to upgrade Saint John pulp mill

机译:欧文浆纸业升级圣约翰浆厂

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The J.D. Irving group of companies of Canada is planning to invest CAD450m (€290m) in updating the production plant at the Saint John pulp mill of its subsidiary Irving Pulp and Paper Limited in the province of New Brunswick in the next two years. The group reports that the first phase of the modernisation measures involves installing a new chip screening and preparation system. In addition, fourteen old chip digesters are to be replaced with a new one. The company estimates a cost of CAD198m (€128m) for the first phase of the project, expected to run over a period of 24 months. In the second phase of the project, which Irving Pulp and Paper says is likely to cost CAD250m (€162m) and last 30 months, the company will be installing a new pulp drying unit. The new system is to replace the three existing dryers at the site, it is said.
机译:加拿大J.D. Irving集团公司计划在未来两年内投资4.5亿加元(2.9亿欧元)更新其子公司Irving Pulp and Paper Limited在新不伦瑞克省的Saint John制浆厂的生产工厂。该小组报告说,现代化措施的第一阶段涉及安装新的芯片筛选和制备系统。另外,将用一个新的旧的消化池来代替十四个。该公司估计,该项目第一阶段的成本为1.98亿加元(1.28亿欧元),预计将持续24个月。在该项目的第二阶段,欧文浆纸公司(Irving Pulp and Paper)表示,该项目可能耗资2.5亿加元(1.62亿欧元),并将持续30个月,该公司将安装一个新的纸浆干燥装置。据说新系统将取代现场现有的三台干燥机。

著录项

  • 来源
    《Pulp and Paper》 |2014年第12期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号