首页> 外文期刊>EUWID Pulp and paper >Prinzhorn Group plans new PM for Spremberg mill
【24h】

Prinzhorn Group plans new PM for Spremberg mill

机译:普林斯霍恩集团计划在斯普伦堡工厂新建纸机

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Hamburger Rieger, a Prinzhorn Holding company and part of the Hamburger Containerboard division, is considering to expand paper manufacturing capacities and has started the approval procedure to set up a second containerboard machine at the Spremberg mill in Germany. The current permission is expiring in January 2017, the Prinzhorn Holding said in a press release on 12 October. According to the press release, the new paper machine will have a width of 7.9 m and is designed for annual production capacity of 493,000 t of containerboard. The €370m investment will create 200 new jobs. The new permission is expected to be granted in January 2017.
机译:Prinzhorn Holding公司旗下的Hamburger Rieger,是Hamburger Containerboard部门的一部分,正在考虑扩大造纸生产能力,并已开始批准程序,以在德国Spremberg纸厂建立第二台Containerboard机器。 Prinzhorn Holding在10月12日的新闻稿中表示,当前许可将于2017年1月到期。根据新闻稿,新纸机的宽度为7.9 m,设计用于年产49.3万吨的集装箱板纸。 3.7亿欧元的投资将创造200个新工作岗位。预计将于2017年1月授予新许可。

著录项

  • 来源
    《EUWID Pulp and paper》 |2016年第42期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号