首页> 外文期刊>Progressive Railroading >Positive reinforcement
【24h】

Positive reinforcement

机译:正加固

获取原文
获取原文并翻译 | 示例
           

摘要

There's only about two years left for the dozens of freight and commuter railroads impacted by the Rail Safety Act of 2008 to meet the federal deadline for implementing positive train control (PTC). Or, nearly four years remaining for those roads that meet certain conditions for a two-year extension, such as the installation of all PTC hardware by 2018's end. When completed, PTC systems will be operating on about 60,000 route miles in the United States. The systems will include devices installed on 25,000 passenger and freight locomotives, or 90 percent of all motive power.
机译:受2008年《铁路安全法》影响的数十条货运和通勤铁路仅剩大约两年的时间,以赶上联邦政府实施积极列车控制(PTC)的最后期限。或者,满足某些条件并延长两年的那些道路还剩将近四年,例如到2018年底安装所有PTC硬件。完成后,PTC系统将在美国约60,000英里的路线上运行。该系统将包括安装在25,000名旅客和货运机车上的设备,占全部动力的90%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号