首页> 外文期刊>Progress in Nuclear Energy >A study on operation time periods of spent fuel interim storage facilities in South Korea
【24h】

A study on operation time periods of spent fuel interim storage facilities in South Korea

机译:韩国乏燃料临时存储设施的运行时间研究

获取原文
获取原文并翻译 | 示例
       

摘要

The saturation of South Korea's at-reactor (AR) spent fuel storage pools has created a necessity for additional spent fuel storage capacity. Because the South Korean government has a plan to increase the number of nuclear power plants to 27 units by 2015, the increase of spent nuclear fuel generation will be accelerated. Because there is no clear national plan for spent nuclear fuel permanent disposal, the Korea Hydraulic Nuclear Power Company is planning to construct a spent fuel interim storage facility with 11,000 tHM capacity for Pressure Water Reactor (PWR). This study estimates the operation time periods of interim storage facilities with regard to the re-racking plan of spent fuel storage pools and construction of new nuclear power plants. To do this, the amount of spent fuel generation was estimated through a nuclear power supply plan until the year 2015. After 2015 year, the amount of spent fuel generation was estimated by using three scenarios that this study assumes according to variation of number of nuclear power plants: the "discontinue scenario", the "maintenance scenario", and the "increase scenario". In the case of the "increase scenario", projections of the share of nuclear power were estimated using the MESSAGE-V method. It is estimated that an interim storage facility will be needed by 2016, and for all scenarios, it is estimated that interim spent storage facilities will be saturated by 2041 with current burnup and by 2049 with extended burnup. In order to get a more meaningful result, it is recommended that a study on the practical storage facility capacity with respect to the risk assessment, public acceptance and further research should follow.
机译:韩国反应堆乏燃料储存池的饱和,使得有必要增加额外的乏燃料储存能力。由于韩国政府计划到2015年将核电站的数量增加到27个,因此将加速乏核燃料发电的增长。由于没有明确的永久性乏核燃料处置国家计划,韩国水力核电公司计划建设一个压力水反应堆(PWR)容量为11,000 tHM的乏燃料临时存储设施。这项研究根据乏燃料存储池的重新安装计划和新核电站的建设,估计了临时存储设施的运行时间。为此,通过核电供应计划估算了直到2015年的乏燃料发电量。在2015年之后,使用了本研究根据核数变化而假定的三种情景估算了乏燃料发电量。发电厂:“停产方案”,“维护方案”和“增加方案”。在“增加情景”的情况下,使用MESSAGE-V方法估算了核电份额。估计到2016年将需要一个临时存储设施,并且对于所有方案,估计到2041年当前消耗的临时用存储设施将饱和,到2049年随着扩展的消耗将达到饱和状态。为了获得更有意义的结果,建议应就风险评估,公众接受度和进一步研究进行有关实际存储设施容量的研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号