首页> 外文期刊>Progress in Nuclear Energy >Maintenance risk management in Daya Bay nuclear power plant: PSA model, tools and applications
【24h】

Maintenance risk management in Daya Bay nuclear power plant: PSA model, tools and applications

机译:大亚湾核电站的维护风险管理:PSA模型,工具和应用

获取原文
获取原文并翻译 | 示例
       

摘要

The importance of proper maintenance for safe and reliable operations of nuclear power plants (NPPs) has long been recognized by the nuclear utilities and regulatory bodies. This paper presents a pilot risk-informed probabilistic safety analysis (PSA) application, i.e. maintenance risk management, conducted in Daya Bay nuclear power plant in P.R. China. The purpose of the maintenance risk management developed in this pilot application is to assess and manage plant risk during maintenance activities using risk-informed PSA insights. Some important issues related to the three-phase maintenance risk management process, risk monitor tools, underlying plant specific PSA model, risk measures and acceptance criteria, and the role of the regulatory bodies and plant managers, etc. are discussed. It is expected that the experience obtained from the pilot study would be beneficial to both regulatory bodies and utilities in promoting risk-informed PSA applications in China and other countries with similar situations.
机译:长期以来,核公用事业和监管机构已经认识到适当维护对核电厂(NPP)安全可靠运行的重要性。本文介绍了在中国大亚湾核电厂进行的风险知情概率概率安全分析(PSA)试点应用程序,即维护风险管理。在本试验应用程序中开发的维护风险管理的目的是利用风险知情的PSA见解来评估和管理维护活动期间的工厂风险。讨论了与三相维护风险管理流程,风险监控工具,基础工厂特定PSA模型,风险度量和验收标准以及监管机构和工厂经理的作用等有关的一些重要问题。可以预期的是,从试验研究中获得的经验将有助于监管机构和公用事业公司在中国和其他情况类似的国家/地区推广风险相关的PSA应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号