首页> 外文期刊>Professional mariner >Gulf Coast shipyards working off backlog... then what?
【24h】

Gulf Coast shipyards working off backlog... then what?

机译:墨西哥湾沿岸造船厂正在积压工作……那又如何?

获取原文
获取原文并翻译 | 示例
       

摘要

Much of the maritime world may be experiencing the painful slowdown of business caused by a worldwide recession, but American shipyards that build inland river tow-boats, tugboats, barges and assorted workboats along the Gulf Coast are forging ahead like it was still the boom years. The boom time is expected to last another year - maybe two - at least until those shipyards have worked off their backlog of contracts and whatever new orders come dribbling in. After that, it's anyone's guess. The effects of the recession may eventually catch up with some of them.rnFor 2009 at least, everything is pretty much known. Contracts are set and deliveries will follow. Few if any of these contracts have been cancelled, although many companies in the inland river world arernexperiencing difficulties.rnAccording to the national shipyard construction record kept by Tim Colton of Maritime Business Strategies and Marine Log, roughly 130 new tugs and towboats are projected to be delivered in 2009. That would be down a bit from the estimated 150 boats delivered in 2008.
机译:由于世界范围的衰退,许多海洋世界可能正经历着痛苦的业务放缓,但是在墨西哥湾沿岸建造内河拖船,拖船,驳船和各种工作船的美国造船厂正在如火如荼地前进。 。繁荣时期预计将持续一年-可能至少两年-直到这些造船厂解决了积压的合同以及任何新订单涌入的情况。在那之后,有人猜测。经济衰退的影响最终可能会赶上其中的一些。至少在2009年,一切都众所周知。订立合同,然后交货。尽管内陆河流域的许多公司都遇到困难,但几乎没有任何合同被取消。rn根据海洋业务策略和海洋日志的蒂姆·科顿(Tim Colton)保留的全国造船厂建造记录,预计将有大约130艘新拖船和拖船这是2009年交付的。这比2008年交付的150艘船略有下降。

著录项

  • 来源
    《Professional mariner》 |2009年第126期|12-15|共4页
  • 作者

    Larry Pearson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:52:10

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号