首页> 外文期刊>Process Heating >Guidebook Offers Tips for Pump Use in Combined-Cycle Power Plants
【24h】

Guidebook Offers Tips for Pump Use in Combined-Cycle Power Plants

机译:指南提供了在联合循环发电厂中使用泵的技巧

获取原文
获取原文并翻译 | 示例
       

摘要

A guide that discusses the application and operation of pumps in combined-cycle power plant service has been published by Hydraulic Institute (HI), Parsippany, N.J. "Power Plant Pumps: Guidelines for Application and Operation to Maximize Uptime, Availability and Reliability" is the first installment of their new series. The guide provides information on the proper pump selection and operation essential for minimizing energy consumption and increasing overall plant efficiency, reliability and profitability. Based on the equipment used in a typical 400 MW combined-cycle plant, it describes important details about the pump types used, offers guidance for proper selection of main and auxiliary service pumps, and describes the significance of proper operation of pumps in power plant service.
机译:新泽西州Parsippany的液压研究所(HI)已发布了讨论联合循环电厂服务中泵的应用和操作的指南,“电厂泵:最大化正常运行时间,可用性和可靠性的应用和操作指南”是他们的新系列的第一期。该指南提供了有关正确选择泵和如何操作的信息,这些信息对于最大限度地减少能耗和提高工厂整体效率,可靠性和盈利能力至关重要。它基于典型的400 MW联合循环电厂中使用的设备,描述了有关所用泵类型的重要细节,为正确选择主要和辅助服务泵提供了指导,并描述了在电厂服务中正确运行泵的重要性。

著录项

  • 来源
    《Process Heating》 |2013年第novaadecaapp期|42-42|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号