Assessing labour-based construction works management processes

机译:评估以劳工为基础的建筑工程管理流程

获取原文
获取原文并翻译 | 示例
       

摘要

The purpose of this paper was to assess the use of process protocol to analyse and identify the key sequential phases and documentation of the management processes of labour-based works in order to achieve a successful project and process execution. In order to achieve the above aim, a literature review of conference papers, reports, available project documents and limited interviews to officials involved in public works programmes were conducted. The analysis showed that there are seven phases with various deliverables spanning from phase zero to phase six. There are three most common operational levels of the management processes and these are subdivided into national level, integrated local level and project level. The process protocol-based phases consider the whole life cycle of a construction project while integrating the process elements under a common framework. Best practices in management of labour-based works have been used to follow and synthesise the process protocol approach to the management processes of labour-based works.
机译:本文的目的是评估过程协议的使用,以分析和确定基于劳动的管理流程的关键顺序阶段和文档,以实现成功的项目和过程执行。为了实现上述目标,对会议文件,报告,可用的项目文件以及对参与公共工程计划的官员进行的有限采访进行了文献综述。分析表明,从零阶段到第六阶段共有七个阶段,其可交付成果各不相同。管理过程有三个最常见的操作级别,分别分为国家级别,集成本地级别和项目级别。基于过程协议的阶段在将过程元素集成到一个通用框架中的同时,考虑了建设项目的整个生命周期。劳工工作管理的最佳做法已被用来遵循和综合过程协议方法,以管理劳工工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号