首页> 外文期刊>Proceedings of the Institution of Civil Engineers. Civil Engineering >Demolition of the Connah's Quay coal-fired power station
【24h】

Demolition of the Connah's Quay coal-fired power station

机译:拆除康纳码头的燃煤电站

获取原文
获取原文并翻译 | 示例
       

摘要

As well as designing, building and operating major infrastructure projects, civil engineers also need to know how to remove them cleanly and safely at the end of their useful life. Built between 1950 and 1958, the 180 MW Connah's Quay coal-fired power station on the mouth of the River Dee in North Wales was closed in 1984 and demolition started in 1992. Demolition involved extensive asbestos removal, toppling massive steel structures and explosive felling of cooling towers and chimneys — all within close proximity to houses, a railway and power lines. This paper explains how extensive preplanning, use of expert contractors, careful control of waste materials and effective prevention of pollution and nuisance resulted in a successfully reclaimed site with minimal local disturbance.
机译:除了设计,建造和运营大型基础设施项目外,土木工程师还需要知道如何在使用寿命结束时将其干净,安全地拆除。建于1950年至1958年之间的位于北威尔士迪河河口的180 MW Connah's Quay燃煤电站于1984年关闭,并于1992年开始拆除。拆除工作涉及广泛的石棉清除,大型钢结构倾倒和炸药爆炸。冷却塔和烟囱-所有这些都紧邻房屋,铁路和电力线。本文说明了如何进行广泛的预先规划,使用专业承包商,精心控制废料以及有效防止污染和扰民,才能在一个使填埋场成功恢复并减少本地干扰的情况下取得成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号