【24h】

Storebaelt eastern railway tunnel: overview

机译:Storebaelt东部铁路隧道:概述

获取原文
获取原文并翻译 | 示例
       

摘要

This paper describes the Storebaelt crossing with its three major constructions: the western road and rail bridge, the eastern railway tunnel and the eastern road bridge. It explains why the £4.2 billion crossing was built and how it will improve communications both within Denmark and internationally. Traffic predictions are outlined, and the main design criteria established: road and rail requirements, environmental constraints and risk acceptance criteria. Project planning organization and financial arrangements are described, with particular reference to management of the eastern railway tunnel. The paper also explains how the project will be operated and maintained in service.
机译:本文介绍了Storebaelt交叉路口及其三大主要结构:西部公路和铁路桥梁,东部铁路隧道和东部公路桥梁。它解释了为什么修建这个耗资42亿英镑的过境点,以及它将如何改善丹麦内部和国际间的沟通。概述了交通预测,并建立了主要设计标准:道路和铁路要求,环境限制和风险接受标准。描述了项目计划的组织和财务安排,特别是对东部铁路隧道的管理。本文还解释了该项目将如何运行和维护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号