...
首页> 外文期刊>Exploration Geophysics >Net community benefits and seismic line rehabilitation — a case study
【24h】

Net community benefits and seismic line rehabilitation — a case study

机译:社区净收益和地震线修复—案例研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In 1999 the Petroleum Group of Primary Industries and Resources South Australia (PIRSA) conducted an audit of seismic lines in the Cooper Basin of South Australia, to assess their condition upon expiry of Petroleum Exploration Licences (PELs) 5 and 6. A significant number of seismic lines located in gibber plains and residual tablelands to the north of Innamincka were identified as being in poor condition, particularly in regard to active erosion. Detailed assessment of the condition of 1200 km of seismic lines was made using maps produced from low-level aerial videography. Key stakeholders agreed that physical rehabilitation of windrows or erosional gullies would be unlikely to make a significant improvement to the environmental condition of the lines. This is consistent with other published research on rehabilitation attempts in similar terrains. Rather than wasting money and effort by forcing the licensees (primarily Santos Ltd) to undertake any physical rehabilitation, PIRSA, Santos, and the Department for Environment and Heritage (DEH) agreed that funding of other environmental projects in the Innamincka Regional Reserve would provide a better net benefit to the local environment. The licensees offered to fund projects to a total of $A660 000 as an offset to undertaking physical rehabilitation. The South Australian Government has accepted this offer. A formal agreement and implementation plan has been developed for the licensees to fund a range of environmental projects within the Innamincka Regional Reserve. In return, the Government agrees that no further rehabilitation of the lines will be required.
机译:1999年,南澳大利亚第一工业和资源石油集团(PIRSA)对南澳大利亚库珀盆地的地震线进行了审计,以评估其石油勘探许可证(PEL)5和6到期时的状况。发现位于Innamincka北部的吉布平原和残余台地上的地震线状况不佳,特别是在主动侵蚀方面。使用从低空航拍获得的地图详细评估了1200 km地震线的状况。主要利益相关者一致认为,对草料堆或侵蚀性沟渠进行物理修复不可能大幅度改善管道的环境条件。这与其他已发表的关于在类似地形中进行修复尝试的研究一致。 PIRSA,Santos和环境与遗产部(DEH)并没有通过强迫被许可方(主要是Santos Ltd)进行浪费而浪费金钱和精力,而是同意Innamincka区域保护区中其他环境项目的资金提供对当地环境更好的净收益。被许可方提出向项目提供总计66万澳元的资金,以抵消进行身体康复的费用。南澳大利亚州政府已经接受了这一提议。已为被许可方制定了正式协议和实施计划,以为Innamincka区域保护区内的一系列环境项目提供资金。作为回报,政府同意不再需要对线路进行修复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号