...
首页> 外文期刊>Hydrotechnical Construction >DETERMINATION OF THE TECHNICAL STATE, REPAIRS, AND QUALITY ASSESSMENT OF WATERPOWER EQUIPMENT AT HYDROELECTRIC PLANTS IN THE UZBEKISTAN REPUBLIC
【24h】

DETERMINATION OF THE TECHNICAL STATE, REPAIRS, AND QUALITY ASSESSMENT OF WATERPOWER EQUIPMENT AT HYDROELECTRIC PLANTS IN THE UZBEKISTAN REPUBLIC

机译:乌兹别克斯坦共和国水力发电厂水电设备的技术状态,维修和质量评估

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

More than 70 hydroelectric units are in operation in the Uzbekistan Republic, generating a total power output of more than 1400 MW (13% of the total power of the republic's power system), with individual power outputs ranging from 1 MW to 155 MW. The units were constructed from 1926 to 1981 by companies from Russia, Germany, Canada, the United States, and England; 80% of the hydrounits have been in operation for more than fifty years and show considerable wear. In light of the economic difficulties of the republic it is essential to institute an efficient, judiciously planned program of maintenance and repair of the power equipment. The Tashkent State Trust for the Organization and Efficiency of Electric Power Plants (ORGRES-Tashkent) began to work on the hydroelectric power plants of Uzbekistan, effectively in 1991 (apart from the three plants of the Middle Chirchik River power grid, for which work projects were initiated at the time of their installation in 1970).
机译:乌兹别克斯坦共和国有70多个水力发电机组在运行,产生的总功率超过1400兆瓦(占共和国电力系统总功率的13%),单个功率的输出范围从1兆瓦到155兆瓦。这些装置由俄罗斯,德国,加拿大,美国和英国的公司于1926年至1981年建造; 80%的水力单元已经运行了五十多年,并且显示出相当大的磨损。鉴于共和国的经济困难,必须制定有效,明智地计划的电力设备维护和修理计划。塔什干国家发电厂组织和效率国家信托基金会(ORGRES-Tashkent)自1991年开始有效地对乌兹别克斯坦的水力发电厂进行工作(除了中奇尔奇克河电网的三座发电厂外,为此开展工作是在1970年安装时启动的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号